Warehouse Inbound process flow to any warehouse starts when items arrive in the warehouse from a company, either from inside sources or from another company. Handling or receiving products in a warehouse is done by (SOP) Standardization Operating Procedure. Warehouse Inbound process flow can be any product such as: raw materials, food items, packets, boxes, etc. And the warehouse can be of any type, big or small, ie it depends on how the warehouse and the goods are.

Are you using the Inbound process to get warehouse goods, or are you just getting them? It is very important. If your warehouse (WMS) is based, you can do some things under WMS, but if your warehouse is not very automated, then you need to build a good Inbound Process and deploy properly. Here we will talk about a common warehouse inbound Process that you can use for any warehouse. It mentions work with responsibility, so let’s see.

Warehouse inbound process

Security Guard – Gate Entry > Step-01

Supplier document Verification – The security takes the document from the driver, then checks its accuracy to see if it has the following documents.
1. Original for buyer invoice and duplicate for transporter invoice
2. Transporter LR copy Loading receipt copy
 
3. Road permit
4. ASN (autonomous system number) number on invoice. if documents are ok, then hand over them to DEO (Data entry operator) for GE (Gate entry) process.

Gate entry DEO  > Gate entry  >Step-02 

1. DEO Takes the documents from security Guard.
2. Check the ASN number written on the invoice in SAP. If the ASN does not exist, send an email to the buyer to get the ASN.
3. Check the invoice qty in SAP. against due qty, If not ok, get approval from buyer.

Gate Entry DEO- Gate entry- Step -03 

Process the Gate entry and Use SAP T CODE and put the following details. 
1. ASN number
2. Enter all all details DC, gate pass, Truck number, transporter
name, GC, vehicle etc.
3. check and put the ASN number, invoice number, part number and qty and click on item OK.
4. if all are ok, then post Now Gate entry number

Security Guard- Gate entry- Step -04

Security takes the following documents from gate entry DEO.
1. Security guard Fill up the INBOUND CONTROL SHEET. 
2. The security guard assigns documents to the Receipt Department DEO for further process

Receipt DEO- Vehicle Unloading – Step -05 

1. Enter the details in Inbound production control file and material receipt register ( in excel)

2. Generate the Counting sheet in Excel

3 sets stationery for the HOT and general parts separately for completed Invoices and take the print.

4. Generate the security case tag for no of cases received as per LR .

5. Security takes the case tag and call the vehicle for

Security > Unloading > Step-06

1. Call the truck and Ensure that driver has applied the hand brake before getting down from the truck.
2. Note the time the vehicle enters the warehouse
In the tracking register
3. Update the Inbound control board

Unloading Dock Supervisor > Unloading > Step 07

1. Arrange Pallet and HOPT
2. Start the truck Unloading with unloading sheet”
3. Put the security guard CASE label in the box /tag on each box
4. Check the received condition of Parts
5. Verify No of Consignments received
6. Do not place a heavy box on a light weight box
7. Properly stacked material on the plate

Unloading dock supervisor > Unloading > Step 08

1. Move the materials to Counting area.
2. HOT Material and general parts to be moved separately in bin location.
3. HOT Material to be checked on priority , and moved to direct location.
immediately no staging in receipt.
4. Binner must be available for HOT Material

Unloading dock supervisor and Security Guard > POD > Step 09

1. Entry vehicle time out in Material register.
2. Stamp on LR
3. Received Pkg
4. Give the remarks If Damage/Excess/Shortage in consignment escalate to your superior
5. Make the endorsement on LR then Hand Over to driver and
update the tracking sheet

Receipt Supervisor > Checking- physical part verification

1. Collect the counting sheet from Receipt DEO
2. Verify the Material code and qty with Counting sheet
3. Check the condition of goods branding, damages, rust,
expired etc.
4. Fasteners to be checked by ratio counting weighing
machine.
5. Reports any discrepancy on Counting sheet
6. Move the material along with 2 sets of Counting to prepacking section.
7. Hand over the Direct to BIN (HOT ) parts to Binner for binning
8. Hand over the Counting sheet to receipt DEO to GRN
9. Receipt DEO to escalate to buyer if any discrepancy reports
10. Lodge an insurance if applicable.
11. Update the Visual control board

Supervisor > Prepacking.> Value added productivity

1. Material feeder will position pallet and material to value added
table ready to take next feed.
2. Check the MOQ Quantity and MDQ Quantity in id Label and Counting sheet
3. Check the Type of Packing
4. Do the sample checking and sign on FIRST piece before prepacking
5. Packer will make the Box
6. Prepare Pouch and paste ID label on it
7. Seal Pouch
8. Position Material in Bin Storage location pallet
9. Update the packer performance monitor sheets.
10. Update the date and times in production file.
11. Position Empty pallets in the Binning Staging area

Binner (Store Incharge) > Material Movement from receipt and prepacking to binning and BIN updation in SAP

1. Counting sheet is taken from pre packing supervisor
2. Material is taken from prepacking / receipt staging zone.
3. Material moved in BIN DROP staging zone
4. Segregate the Material zone wise
5. Move the material to right bin in RIGHT location.
6. Update the Binner performance monitor sheets.
7. Update the BIN number in SAP.

 

Receipt DEO > GRN

1. Check and entry the correct qty in Migo.
2. Enter Short qty if short received from vendor
3. click on Check
4. if all are ok, then post
5. Note down GRN number in invoice

Summarize

I do not know if this is Inbound process according to your warehouse or not, but you can make a good inbound process with its help. SOP is very important for any operation.
The warehouse inbound process flow (standard operating procedure) is a set of instructions from any organization that helps workers conduct routine operations and SOP aims to follow the rules of any operation and achieve efficiency and quality while minimizing miscommunication and failure It does the work of conducting.
Share Anywhere

10 thoughts on “Warehouse inbound process flow-WH Blog-10

  1. Aw, this was a really nice post. In thought I wish to put in writing like this moreover – taking time and precise effort to make an excellent article… but what can I say… I procrastinate alot and not at all appear to get something done.

  2. An interesting discussion is price comment. I believe that you must write extra on this subject, it may not be a taboo topic however usually individuals are not enough to speak on such topics. To the next. Cheers

  3. Thanks for your tips on this blog. One thing I would choose to say is that purchasing electronics items over the Internet is nothing new. In fact, in the past several years alone, the market for online electronic products has grown significantly. Today, you will find practically any type of electronic unit and devices on the Internet, ranging from cameras in addition to camcorders to computer components and video gaming consoles.

  4. w88A peerless full stop shop path of litigate is dependably the handiest and all but channelise right smart to administer with acquiring mischance vehicles repairs carried out, so determination so much a matchless end patronise halting design could save up you a substantial valuate of clock time and trouble, and perhaps money.

  5. Hello would you mind stating which blog platform you’re working with? I’m going to start my own blog soon but I’m having a hard time selecting between BlogEngine/Wordpress/B2evolution and Drupal. The reason I ask is because your design seems different then most blogs and I’m looking for something completely unique. P.S Apologies for being off-topic but I had to ask!

  6. Attractive section of content. I just stumbled upon your website and in accession capital to say that I acquire in fact enjoyed
    account your blog posts. Any way I’ll be subscribing to your augment and even I achievement you
    access consistently fast.

Leave a Reply

Your email address will not be published. Required fields are marked *